久久精品国产国产精-中文字幕久久波多野结衣av-精品久久久久久中文字幕无码vr-亚洲国产一区二区三区波多野结衣-最新国产精品久久精品

Technical document

Setting Skills for Holding Time in Gas-Assisted Injection Molding

2026-03-01 10:40:23 Injection Molds

Gas?assisted injection molding is widely used for thick?wall, long?strip parts in automotive, home appliances, electronics, and furniture. It reduces clamping force, weight, sink marks, and warpage. However, holding time settings differ greatly from conventional molding and directly affect quality, dimensions, and stability. Improper settings lead to channel collapse, sink marks, flash, bubbles, and poor structure.

Basic Logic: Melt Holding and Gas Holding

Gas?assisted holding includes two stages: melt holding and gas holding. Melt holding fills the cavity and forms a stable layer before gas injection. Gas holding uses nitrogen to support the wall, compensate shrinkage, and prevent sinking.

Short melt holding causes blow?through, piercing, or channel leakage. Excessively long melt holding prevents gas penetration and channel formation. Insufficient gas holding causes collapse and sink marks. Too long gas holding reduces efficiency and increases stress. The key is to seal the cavity first with melt holding, then support with gas holding, and release pressure before gate freeze?off.

injection mould

Melt Holding Time Setup

Melt holding time is typically 0.5–2.5 seconds, based on part thickness, gate size, and material.

Small, thin parts with small gates: 0.5–1.0 second

Medium parts: 1.0–1.8 seconds

Large, thick parts with large gates: 1.8–2.5 seconds

The ideal time is when the cavity is sealed but not fully frozen, allowing stable gas penetration without blow?out.

Gas Holding Time Setup

Gas holding time is usually 3–10 seconds, longer for thick parts. It maintains internal pressure to compensate cooling shrinkage. Sink marks or channel collapse mean gas holding is too short. The optimal time is when no sinks appear and channels remain stable. Crystalline materials such as PP and PE need slightly longer holding than amorphous materials.

Switching and Pressure Relief Control

The sequence is critical: end melt holding → inject gas immediately → hold gas until just before gate sealing → slow pressure relief → cooling.

Sudden pressure release causes dimples, bubbles, and ripples. Two?stage pressure relief is recommended: reduce to 30–50% for 0.5–1 second, then fully release. Holding time must match cooling to ensure rigidity before ejection.

injection mould

Common Defects and Adjustments

Blow?through: shorten melt holding, lower gas pressure

Sink marks: extend gas holding, increase pressure

Incomplete channels: shorten melt holding

Channel collapse: extend gas holding, delay relief

Long cycle: reduce holding times appropriately

Weld lines: slightly extend melt holding

Summary

Holding time in gas?assisted molding is adjusted dynamically according to part structure, material, mold, and machine. Melt holding ensures sealing without blow?through; gas holding ensures dimension and appearance. Stable, smooth switching and pressure relief guarantee high consistency and productivity.

injection mould

Home
Product
News
Contact
主站蜘蛛池模板: 看免费的无码区特aa毛片| 少妇又爽又刺激视频| 996热re视频精品视频这里| 麻豆视传媒精品av| 国产成人无码短视频| 国产亚洲精品久久久999蜜臀 | 久久人人爽人人人人片| 亚洲精品欧美综合一区二区| 国产免费一区二区三区vr| 亚洲精品亚洲人成在线观看| 亚洲性人人天天夜夜摸| 国产精品激情欧美可乐视频| 2021久久精品国产99国产精品| 国产av新搬来的白领女邻居| 国产真人性做爰久久网站| 精品熟女日韩中文十区| 国产乱子伦农村xxxx| 日日干夜夜操| 日韩人妻少妇一区二区| 久久午夜无码鲁丝片直播午夜精品| 视频久re精品在线观看| 欧美成人a在线网站| 九九热爱视频精品| 无码国产伦一区二区三区视频| 人妻丰满熟妇av无码区app| 国产成人欧美一区二区三区| 强开小婷嫩苞又嫩又紧视频韩国 | 精品无人区卡一卡二卡三乱码| 久久毛片| 18?????网站| 欧美成人秋霞久久aa片| 日本高清在线一区至六区不卡视频 | 国产av天堂无码一区二区三区| 在教室伦流澡到高潮hgl动漫| 午夜成人亚洲理伦片在线观看| 丁香色婷婷国产精品视频| 人人妻人人爽人人狠狠| 99pao在线视频国产| 国产精品亚洲专区无码第一页| 亚洲精品乱码久久久久久自慰| 国产免费不卡午夜福利在线|