久久精品国产国产精-中文字幕久久波多野结衣av-精品久久久久久中文字幕无码vr-亚洲国产一区二区三区波多野结衣-最新国产精品久久精品

Technical document

The segmented principle of multistage injection molding

2025-01-06 14:46:53 Multistage injection molding

I. Flow Characteristics of Plastic Melt

Screw - Propelling Phase

  • Initial Segment:

    • Usually starts from the beginning of injection molding. Its main function is to enable the plastic melt to stably enter the main runner of the mold from the barrel. The injection speed is generally slow, mainly to prevent the melt from splashing at high speed and causing air entrainment. For example, for high - viscosity engineering plastics like PC (polycarbonate), the initial speed can be set at 10 - 30% of the maximum injection speed.

  • Main Filling Segment:

    • Once the melt smoothly enters the main runner, adjust the injection speed according to the complexity of the mold cavity and the wall - thickness distribution. For simple products with uniform wall thickness, a relatively high and stable speed can be used for filling to improve production efficiency. For instance, for a thin - walled simple container made of PP (polypropylene), the injection speed can be set at 60 - 80% of the maximum injection speed.

    • For complex products with wall - thickness differences, increase the speed appropriately in thin - walled parts to ensure rapid filling and prevent short - shot. Slow down the speed in thick - walled parts to avoid defects such as gas entrapment and flash. For example, when injection - molding plastic products with ribs, increase the speed when filling the rib areas (thin - walled parts) and slow down in the main thick - walled parts.

  • Buffer Segment before Pressure - Holding Switch:

    • The speed in this segment gradually decreases to enable the melt to smoothly transition to the pressure - holding phase. The main purpose is to avoid defects caused by sudden pressure changes during the pressure - holding switch. The extent of speed reduction depends on the plastic's properties and product requirements, generally reducing the speed to 10 - 30% of the maximum injection speed.

    injection mould

Pressure - Holding Phase

  • First Pressure - Holding Segment:

    • At the start of pressure - holding, the pressure is relatively high, mainly to compensate for the volume shrinkage of the plastic during cooling. For crystalline plastics (such as PA - 6 polyamide 6), since their crystallization process leads to significant volume shrinkage, the pressure in the first pressure - holding segment is usually high, which can be set at 70 - 90% of the maximum injection pressure to ensure the product's dimensional accuracy.

  • Middle and Final Pressure - Holding Segments:

    • As the plastic cools further, the pressure - holding pressure can be gradually reduced. The pressure in the middle segment can be reduced to 40 - 60% of the maximum injection pressure, and in the final segment to 10 - 30%. This can ensure product quality while reducing residual stress and preventing warping and deformation after demolding. Meanwhile, the pressure - holding time should be determined according to the product's wall thickness and the plastic's thermal properties. Generally, thick - walled products require a longer pressure - holding time, while thin - walled products need a shorter one.

II. Characteristics of Product Structure

  • Wall - Thickness Differences:

    • For products with uneven wall thickness, segment according to the wall - thickness distribution. In thin - walled parts, use a faster injection speed to ensure rapid filling and prevent the melt from becoming too viscous to fill due to excessive cooling. For example, when injection - molding the shell of an electronic product with thin - and thick - walled connections, the injection speed in thin - walled parts can be 1.5 - 2 times that in thick - walled parts. Slow down the speed in thick - walled parts to avoid gas entrapment and sink marks.

  • Complexity of Structure:

    • For products with complex structures, such as those with side holes, undercuts, ribs, etc. Adjust the injection speed and pressure appropriately when filling areas close to these complex structures. For example, slow down the speed when filling areas near side holes to prevent the melt from breaking through the hole walls; increase the pressure appropriately when filling rib parts to ensure complete filling.

  • Appearance Requirements:

    • If the product has high appearance - quality requirements, such as no flow marks and weld lines on the surface. Control the injection speed and pressure well during the filling phase of the appearance surface. Generally, use a relatively low speed and appropriate pressure to achieve good surface quality. For example, for automotive interior parts with strict appearance requirements, the injection speed during the filling phase of the appearance surface can be set at 30 - 50% of the maximum injection speed, and cooperate with an appropriate mold temperature to reduce surface defects.

injection mould


Home
Product
News
Contact
主站蜘蛛池模板: 少妇被粗大的猛烈进出69影院一| 欧美成人精品第一区| 熟妇熟女乱妇乱女网站| 一本加勒比波多野结衣| 亚洲综合日韩av无码毛片| 亚洲日韩乱码中文无码蜜桃臀| 久久99精品久久久久免费| 天天拍夜夜添久久精品| 尤物色综合欧美五月俺也去| 久久久久久亚洲精品a片成人| 人妻少妇中文字幕久久| 色一情一区二| 成人性生交大片免费看| 乱子伦av无码中文字| av无码精品一区二区三区| 无码国内精品久久综合88| 国产色视频网站免费| av大片在线无码永久免费网址| 国产aⅴ精品一区二区三理论片| 精品一区二区三区无码免费视频| 久久人爽人人爽人人片av| 丁香啪啪综合成人亚洲| 国产互换人妻xxxx69| 国产热の有码热の无码视频| 免费国产黄网站在线观看视频| 18禁无码永久免费无限制网站| 久久久精品人妻一区亚美研究所 | 亚洲手机在线人成网站| 99久久免费精品国产72精品九九| 在线看片福利无码网址| 一本色道久久99一综合| 99热这里只有精品国产免费免费 | 亚洲性无码av在线欣赏网| 日韩亚洲国产高清免费视频| 亚洲色资源在线播放| 午夜成午夜成年片在线观看| 乱人伦人妻中文字幕在线入口| 无码人妻丰满熟妇区五十路| 国产精品久久久久7777| 国产成人综合亚洲欧美日韩| 亚洲欧美18v中文字幕高清|